Search
Barge-mounted MLC300 helps in Illinois bridge replacement
Kraemer North America (Kraemer) is using a Manitowoc MLC300 crawler crane to help replace an 84-year-old truss bridge, the 2,482 ft-long Savanna-Sabula Bridge near Savanna, Illinois. The Illinois DOT hired the Plain, Wisconsin-based company to construct the new bridge, which spans the Mississippi River between Savanna and the island community of Sabula, Iowa
Manitowoc debuts new version of MLC300
Manitowoc has introduced an upgraded version of the Manitowoc MLC300 that utilises a fixed-position counterweight.
Manitowoc debuts new version of MLC300
Manitowoc has introduced an upgraded version of the Manitowoc MLC300 that utilises a fixed-position counterweight. This new model has many of the same features as the original MLC300, but does not feature Variable Position Counterweight (VPC) technology.
MLC300 fits Into Chicago job site
A Manitowoc MLC300 is at the centre of a mixed-use development construction project in Chicago, Illinois, lifting precast concrete panels to build an eight-story structure.
Manitowoc MLC300 fits onto Chicago job site
A Manitowoc MLC300 is at the centre of a mixed-use development construction project in Chicago, Illinois, lifting precast concrete panels to build an eight-story structure.